Sorry mate no pics. We fixed then to wall and used the outside upright for the standard, then fixed a readylock transom on the beam and spurd back down to the bottom of beam. We fixed it in stone like you got to do and it was holding all the slate and the temp roof no problem. Where u from aom? I've got drawings in yard could get hold of if your local to Yorkshire.