Working with and advanced the other day round 4 side 1 gable was beamed and a wall run off the back of the other gable on the back was 2 13ft bay windows and as it happend by time it was off to miss the gutters it was 6 boards off so inbetween the bays windows dropped 3 snandards in ion doubbles under slung and tranned bottomg lift(was 4 top lift was boards came back to board rest of lifts out ) so worked out 5 and 1 inside on bottom lift i looks at advanced doing the out sie of the right bay window tens shot in boardes out and under slun from first tranny to retun 9 ft away not picked up and same was done on the left of the left bay window althow the was no retun so i had based out for 5 more boards plus 1 inside board he had needled in 6 boards and said i its only for painting lol 6 inside boards just shook me head at him lol