As far as am aware they do have board reducers but then again it will only reduce the gap to the size of 1of the decks and plus ya still need the by size deck to reduce from the cost isunreal comparedto tube and fitting b ut with a good few labs 1 scaff can knock a fair bit we use 1 man 2 2 labs on it only way the lab can keep up and soon as its 2 for 2 no chance on keeping up spechally after 3 lifts so its never 2 scaffs to 1 lab on it. Its just gtting use to all the bits for them 1's yav used them ya instantly know bang thats what ya need we use a few bits of it
ledgers boards obv then 1/2 board hop ups (some with a punchen in and some with out) 2 board tranny 3 board tranny loading bay frames (6789 ft trannies) board reducers,3 board brackets and standards and punchens and dont think we need any thing eles altghhow this wnt be 10% f the parts it does our spot worth investing aom(gangs on its way ) dont ya think jay....i trad smah it up like our spot but with no crane ya duggerd after 3rd lift unless ya have 2 per lift