Havespannerwilltravel
Moderator
- Joined
- Aug 5, 2010
- Messages
- 13,378
- Reaction score
- 0
Ok hard to see that from the photos. Cheers.
Are the outside standards not hanging off beams?
I work from Buxton/Chesterfield for High Peak Scaffolding mate, just managed to get that job up that end.
As said pictures were before completion, I think the designers looked at the weight the bridge could take and used ever KG of it lol, ott springs to mind by the end of the job with triple plan bracing the whole way through the beams and double plan bracing under the hanger
All was to drawing and passed by the designer first time after.