It does seem a strange way of working shane but if that's what had to be done.
I'll show you the boiler we banged up on here last week if you want, your not a boiler rat yet but your still not to old to learn
.
PS isn't your Damo running the bridge job
Lol I've heard that boiler has been up that many times even labourers can put it up now
Yeah dames running the Drax/Shephards job mate, they got proper scaffolders in for the complicated work not union run blue book guys as they moan to much
.
Be careful Shane, the union is already looking into your company not paying agreed rates. Moths on the job as we speak
.
PS
Up and down in Layher as well
When does CDM 2007 (Construction, Design and Management Regulations 2007) apply to a project?
The CDM 2007 Regulations apply to most common building, civil engineering and engineering construction work. You must notify HSE of the site if the construction work is expected to either:
last longer than 30 days; or
involve more than 500 person days of construction work;
HSE should be notified in writing before construction work starts; you can use form F10. Your notification should be sent to the HSE office nearest to the proposed site.
How to notify a project (Form F10)
Further information on CDM 2007 is available on HSE's construction section.
Reference
L144 - Managing health and safety in construction (ISBN 9780717662234 - available from HSE Books)
.
Are you sure about CDM
Shane when you can knock a boiler up in six days you know you're up there with the best mate. I'll get you on here next outage idf you want
I work from Buxton/Chesterfield for High Peak Scaffolding mate, just managed to get that job up that end.
As said pictures were before completion, I think the designers looked at the weight the bridge could take and used ever KG of it lol, ott springs to mind by the end of the job with triple plan bracing the whole way through the beams and double plan bracing under the hanger
All was to drawing and passed by the designer first time after.
I agree aom. It almost sounds like the designer has had a scaffold built, men have gone and worked on it then integral parts such as bracing has been added later. Maybe Alan R can say what he thinks?
100% HSWT/AOM, cant see how the scaffold designer has this as a thought process at all.
regards
Alan
There was double plan bracing on the underside of the hanger.