Quote from Lad Doing Job.
The reason for all the standards is, it's going up 31 lifts, and on the double standards, from levels 5 to 10, the whole scaffold is offset from the base out 500mm to accommodate to the building stepping out, I have to piggy back the standards with ladder beams(4 in total on each set of double standards) then punch up the new standards from the 2 middle beams, then from L10 to L18 it steps back in to the same line as the base out, so you can imagine, I haven't got much room for error or I will never get the beams in, the standards are 225mm apart, which is what I need to get the puncheon on, no pressure then, but I've got good lads putting that up, still shitting it though