Havespannerwilltravel
Moderator
- Joined
- Aug 5, 2010
- Messages
- 13,377
- Reaction score
- 0
I read this posted by Trad recruitment on the jobs page. And I quote " can work to outputs that are the Industry norm which forms the basis upon which all Scaffolding Companies price and secure work at."
Now I am well aware of the output required in the Gulf (a fair bit) and Australia (not very much) so was wondering what sort of output is the industry norm in the UK these days.
Is it in m3, m2, linear metres, the square, plus boards, so many boards an hour, are TBT's etc included in this output?
Maybe some input from the big PLC guns, Trad etc. can be compared with that from say southernpoofter, philiousmaximus etc.
Now I am well aware of the output required in the Gulf (a fair bit) and Australia (not very much) so was wondering what sort of output is the industry norm in the UK these days.
Is it in m3, m2, linear metres, the square, plus boards, so many boards an hour, are TBT's etc included in this output?
Maybe some input from the big PLC guns, Trad etc. can be compared with that from say southernpoofter, philiousmaximus etc.