paul
Well-known member
I have got this job and it has a ten metre span to bridge with unit beams and the scaffold will eventualy be twelve boarded lifts , in the past with this span i have put unit beams in and then i have put another set of unit beam on top about 300mm above the first set of beams which makes a deeper beam but what i am being told now is that to coup with the weight the supervisor wants the second set of unit beams side by side so you will end up with four rows of unit beams .
What i am keen to know is is it strong putting them on top of each other or going side by side ?
Hope i have explained it ok ?
What i am keen to know is is it strong putting them on top of each other or going side by side ?
Hope i have explained it ok ?