Am I being thick? Got a drawing for temp roof , it’s a splayed building so they want it done with 3 separate tinned roofs. One each side and one just above in the middle which is wider one end than the other…the designer is saying use swivels for the purlins? Can’t see how that’s gonna work with the sheets? Am I missing something here?