I have been told always on the outside of the structure based on the fact the ties will pop off when the wind exceeds a certain speed thus reducing the likleyhood of your scaffold blowing over, if its fixed to the inside the standards, handrail, braces etc will prevent its movement.
with any structure now under the new tg:20 guidelines. Every sheeted structure should, by law, be designed.
I would argue whether it it the 'law' or not
I would argue whether it it the 'law' or not
hi , been in the game 33 years allways on outside dont like monarflex acts like sails on a ship but if you put it on the inside it cant break free of the standards and the chances of blowing youre job over are higher stick to the old ways they are there for good reason cheers .Does anyone know if it's OK / not OK to sheet on the insides of the standards??
Got a job on which would be loads easier to do if it was on the inside..
cheers!!