Hi Gun slinger,
Its easier to have off shore scaffolders working on the installation at this time as we have alot of work to do with the friction clamps, and guy offshore guys do thos word day in day out.
It's not to say that you can't do the job, but ATM were just after guys with rig Experiance.
However
We may have to scaffold all 8 columns for blasting and painting, subject to a survey being carried out.
We have a design team working on the drawing and calculations atm. if it we get a green light We will be looking for scaffolders to build up off the pontoon to the top of each columns

This is a 45-50 day job. On the back of this job is the sister rig same place same location. And that job is even bigger
If your interested email all your details including copys of you cards to. Gavin.crothers@harrispye.com and if we do require additional men on this project I will be in touch

Cheers

---------- Post added at 08:46 PM ---------- Previous post was at 08:42 PM ----------

6 blokes?

46 maybe? thats a lot of scaffold to do that quick.
We are kicking the job off with 12 men. Then adding more men as we need them.

---------- Post added at 08:47 PM ---------- Previous post was at 08:46 PM ----------

6 blokes?

46 maybe? thats a lot of scaffold to do that quick.
We are kicking the job off with 12 men. Then adding more men as we need them.
 