Polesapart
Active member
- Joined
- Jan 25, 2012
- Messages
- 28
- Reaction score
- 0
Wotcha...:nuts:
Need a few ideas, perhaps some of you lads have erected this sort of thing before? So I am looking for ideas on erection times, or quantitive formulas for quotation purposes.
So with that in mind, the Uprights are 10ft tubes, driven .6M into the ground with 3m standard spacings. Then a triple handrail attached, finally every upright to havean 8ft brace tied to a butt again driven into the ground....
Last double H-rail edge protection as A-frame I did was £12.50 per meter.. This is very different, I want the job so I don't want to take the P(*& when costing it up.
Cheers.
Need a few ideas, perhaps some of you lads have erected this sort of thing before? So I am looking for ideas on erection times, or quantitive formulas for quotation purposes.
So with that in mind, the Uprights are 10ft tubes, driven .6M into the ground with 3m standard spacings. Then a triple handrail attached, finally every upright to havean 8ft brace tied to a butt again driven into the ground....
Last double H-rail edge protection as A-frame I did was £12.50 per meter.. This is very different, I want the job so I don't want to take the P(*& when costing it up.
Cheers.