I have heard of a couple floating about Dandaps but the last request was met with a certain amount of derision. Please feel free to include Aom should anyone be felling generous.
Lip ties removed photographic evidence provided
Was one row of ties missing due to building being ship lapped , also a plan brace missing out some beams and 3 joins on uprights in same bay
I signed off scaffold with a cert to pick up 3grand cash ( profits before safety) !!!!!
HSE inspector been over me like a rash last 5 years , had to let him win one
I remember you telling us that some time ago. If the fine was not bad enough you will hear plenty about it through the forum, I suppose we are all just a small mis-judgement away from a similar position.
Most of our tube has been up for a long time Paddy, I have only really used the IW for a few shifts. Most of our jobs seem to have been system the last couple of months so a 100 double loading bay will be a welcome change.