100 Scaffolders (all grades) Required for a Massive Shutdown at Scunthorpe Steelworks

Don't trust vital resources guys . Offering loads of work ull be lucky to get a week .
 
Matthew, I understand what you're saying and it’s as frustrating for us as well when the job doesn’t last as long as expected. All we can do is pass on the information that is provided to us from our client and hope it pans out like that. But to be fair on this occasion we have been on site and seen the program and can see what we have quoted to be true on this occasion.
 
wot goings on ere kamrun ringings me and say yu messings wiv him, agerncy yu better watch back I lash yu 40 time witv yur tie and kick yur ass
 
See wat ur saying vital resources . Maybe need to look at ur clients as u making urself look un professional when u offer a couple weeks work , clock out the 2 nd day and ur laid off . Harsco are flooding this site every time to get work done ASAP without a thought for the labour .
 
They don't want a 100 scaffs at all, about 15-20 tops, I'm on there full time with harsco and there's already about 6 lads on there through agency at the min, there's three separate shut downs coming up each lasting about two weeks each but will mainly be manned with the locals first.
 
TEX 87

nice hear that a scaff on site tells it how it is

20 scaff's tops

so whats the other 80 for.

cv data base building.
 
Again I'll repeat Kamran Khan Rajput call the office if you’re interested but we will not sub contract this out and we will not pay you the wages of others.

Can only access this thread when at work and not from home so don't get much chance to follow it.
Great to see Kamran Khan Rajput putting Vital resources through the wringer.:D
 
Top Bottom