would you put up with this

Assuming you were two handed.
£60x2=£120 up
£60=down thats £180,and two hour drive in a wagon,thats at least £50 up and the same down,so thats £280,the average price for a solar job as you've described is only £350,so your boss has made £70,and if you throw a labour'er in,he's on a loser,it's not good for anyone but as you say needs must,take the drive time out,and times the jobs by three,is the only way to make money on these jobs imo;)

I think the £60.00 will be for the job so 2 men will have to erect 4 of these a day to make their money
 
doing that for 60 quid, makes scaffs look like fukin idiots....
 
Everyone goes on about us being proffesional etc, and then were doing jobs like this for £60, fuk that...
 
Dont get me wrong i know its sh1te money but 3 a day gives 2 men £90.00 each and anything is better than the dole, if there is no work in that particular area anything is better than nothing
 
Dont get me wrong i know its sh1te money but 3 a day gives 2 men £90.00 each and anything is better than the dole, if there is no work in that particular area anything is better than nothing

Hi Bren
That has got to be £60 per man, per job?surely?maybe benjo0211 can clarify?
 
Top Bottom