A beam as long as there is nothing above it which for me is a wee bit dodgy as we like to put them in as soon as we can to protect whatever we are spanning.
Fine as long as you are only going 4 lifts or plan bracing every 4 lifts. I never took to the double bay thing and the double bay one lift looks a load of b0llocks but they tell me it's the strongest option.