sway brace

iv got all the info on a disc somewhere , im sure its every 6th bay now and should be through 2 bays 2lifts with a raker at the start and finish of it , the top of the sway should meet a raker/ledger brace and a tie . if you do one bay and the scaffold is over 8m then plan brace is every other lift . you should never go 2 bays one lift cos the middle swivel is more than 300 mm from the node point and the angle is ****
 
It's like facade bracing I think Phil :)
Dont quote me on that though mate I'm not 100% :D
 
Top Bottom