happyhugenoet
Well-known member
even before you get to the centres you are told by your chargehand etc
its second only to check the fittings before you send them up.
its second only to check the fittings before you send them up.
One set of standards to the next, I would call a bay.
Start with a 16 with your first inside ledger a 21 as your back ledger. Then alternate on the lift above. A bay is 2m x 2m 4 standards 2 ledgers
No it doesn't ha. You should only ever have one sleeve in each 2m x 2m bay for your ledgers (or what ever size your bays are) the only other sleeves would be toppers or handrails but we now have stagger handrails ha
No it doesn't ha. You should only ever have one sleeve in each 2m x 2m bay for your ledgers (or what ever size your bays are) the only other sleeves would be toppers or handrails but we now have stagger handrails ha
Can you have both sleeves on ledgers in the same bay aslong as in the next lift their in a different bay, yes or no ?
Keeping it no more than a 3rd into the bay is a pain in the @ss like
Can you have both sleeves on ledgers in the same bay aslong as in the next lift their in a different bay, yes or no ?