i was thinking you were on about something like this its not the actuall product but very similar i have just had to to some air pruching off with the ledger to juts get the heads lol and 2 of them 1 top of splice and 1 bottom
View attachment 1846
How would you use that to splice a hanger, it’s not possible or correct me if I am wrong, you would only be able to hang another hanger with them off your existing hanger or puchin, which would not be safe as you would be putting the load all on the rosette on your standard, they would be ok for 1or 2 lifts but no more than that. I have seen them rosettes break before, or they are used to secure system sheeting on the outside of your scaffold.
i wasnt meaning to splice for hanger, just to splice for what ever reason. when frank ask about layher needing splices i couldent think of a reason why it would need to be, and when some one mentions off shore brackets/and bunny ears but never had a pic i assumed there were tlaking about the pic i posted.? i only work with the simples of layher companents for street work non of these fandangle bit lol and half the time ya never given the time to base it out right to get ya returns set we use the u ledgers for boards and o ledgers for ledgers only just got the two board uledgers could do with 1 board ledgers as the amount of times if you didnt use the two board and just used the 1 board you wouldnt need inisde boards on returns and stuff if ya get me.
fekin h8 the stuff but if you got all the companants to hand or most you can doa good job but i will say this you are fuked with lift highes 500mm and not come acrros anthing to change the lift hights half way up
i was thinking you were on about something like this its not the actuall product but very similar i have just had to to some air pruching off with the ledger to juts get the heads lol and 2 of them 1 top of splice and 1 bottom
View attachment 1846