philliosmaximus
Moderator
Maybe 8am on a building site or an industrial site , but on any street firm i have worked for its in the yard at 6-6.30 get in lorry , go to breakfast , start on job at 8 then work through to about 11 , have a break and then work through until about 3 , back to yard , load up for morning , thats the trouble with sites its all about punching hours , fag breaks , and sh it breaks , not for me or a lot of lads i know .