Unfortunately marra, under the current regs you would require a design for your sketch.
whys that its a normall scaffold correct sized bays i why would that require a drawing
sayign this bu the she site these all need drawing Scaffold structures that need to be designed
Dead Shores
Flying shores
Raking shores
Cantilevered scaffolds
Truss-out Scaffolds
Access Birdcages
Façade retention
Access scaffolds with more than the 2 working lifts allowed with TG20 'Basic Scaffolds'
Buttressed free-standing scaffolds
Temporary roofs and temporary buildings
Support scaffolds
Loading Bays founded on the ground
Mobile and static towers outside base/height limitations
Free standing scaffolds outside base/height Limitations
Temporary ramps and elevated roadways
Staircases and fire escapes
Spectator Terraces and Seating Stands
Bridge scaffolds
Towers requiring guys or ground anchors
Offshore scaffolds outside Offshore Contractors Association (OCA) handbook
Pedestrian footbridges or walkways
Slung and Suspended scaffolds
Protection fans, Nets and Pavement Frames
Marine scaffolds
Boiler scaffolds
Power line crossings
Lifting gantries and towers
Steeple scaffolds
System scaffolds outside users guide parameters
Sign board supports
Sealing end structures
Temporary Storage on Site
Masts, Lighting Towers and Transmission Towers
Advertising hoardings/banners
Any scaffold structure subject to:
Vibration
High Loading
Long term duration
High risk areas
Loading from passenger/goods hoists
really twisted me tahs this 1 as to why that sketch would need a drawing and why half of thses do to
Find that hard to believe lol!!
lol honestly am gifted '' left handed'' loks like a spders crawled over the page ow i and my english isnt to gr8 ither lol and aom thinks his has a lad with learning disabilities ahahahhah ]