Leeds cash work from tomorrow.gang req..urgent...

as my previous posts nothing wrong with pricework especially with adequate supervision and quality control
 
Yes Thank you very much Ray your a superstar.. Top gezzer carnt thank him enough...

Hopefully saved mi mate from £****'s in contracharges......and hopefully saved his buisness....and his home......
 
no worries,it was a pleasure working with you....But please if i ever EVER ever get to work with you again dont call me...areeee theeee allreeeeet COCKER.......

enough,s ENOUGH ;-)

Right its Saturday and im off to spend some hard earned cash ;-)
 
no worries,it was a pleasure working with you....But please if i ever EVER ever get to work with you again dont call me...areeee theeee allreeeeet COCKER.......

enough,s ENOUGH ;-)

Right its Saturday and im off to spend some hard earned cash ;-)

.
Its not steves fault he's a dingle :D
 
Good for you lads, 40 foot x 4 lifts top boarded plus some striking is not exactly mountains. Most price work gangs years ago would have done that in 2 days maximum.
Maybe some scaffolders today just havent got the stomach for price work and are quite happy to hide behind safety etc
well it was 40ft x 4 lifts from 4th lift to 8th lift.Also the striking too in three days and only had a labourer for two days..I think we did ok and saved steves mate from 1000,s of pounds in penalties too..Well the good news is ive been asked to stay on till the end of september now with some dam good prices too..Hard earned graft as paid off so i arnt complaining
 
you cheeky sod Ray.... im happy postive things have come from it.. I start the new job tomorrow full time inspecting so i would imagine i'll be upsetting a few lads over the next few weeks..

Ian i thought more of you.lol..
 
you cheeky sod Ray.... im happy postive things have come from it.. I start the new job tomorrow full time inspecting so i would imagine i'll be upsetting a few lads over the next few weeks..

Ian i thought more of you.lol..

.
Hope the new job goes well mate, if you need any advice let me know
 
price

This price is an insult. has this person ever been on the spanner? gonna need 3 spanners turnin and 2 labourers yh. @ 4 days and i say maybe there is no forks or crane to get gear up and down so theres the time lost already call it £1600 u got deal. scaffs people buy us 4 how we sell ourselves REV UP, ur worth more.:blink1::blink1::blink1::blink1:
 
This price is an insult. has this person ever been on the spanner? gonna need 3 spanners turnin and 2 labourers yh. @ 4 days and i say maybe there is no forks or crane to get gear up and down so theres the time lost already call it £1600 u got deal. scaffs people buy us 4 how we sell ourselves REV UP, ur worth more.:blink1::blink1::blink1::blink1:

Forks or crane to get gear up and down?????Does every 8 lift scaffold require a forklift or crane now these days?????
 
hahahahahaha whats wrong with the rope and wheel for erecting and a light line for striking its all we ever use, good man on the rope 2 guys fixing it goes up lively, and we only use a rope after 40 foot high. a good street gang would smash the granny out of that job even 2 handed.our targets for price work used to be no less then 8 square a man a day most days it was 10 square plus
 
Wel Raymond was happy with the price, just shows there are still some decent price work lads about that are capable of doing the job
 
Two days two men rope or lorry strap, catch 5fts from 6 lifts anyway.

Always done price work.

Done a double width designed 13ft tower 18 lifts high. 9 braces each lift six plan braces every forth. Top three lifts boarded. Given two weekends to do it first day started at 6am completed it at 6.30pm two handed. The boss was p***d off paying us two weekends for a days work!!

Ragscaff
 
Two days two men rope or lorry strap, catch 5fts from 6 lifts anyway.

Always done price work.

Done a double width designed 13ft tower 18 lifts high. 9 braces each lift six plan braces every forth. Top three lifts boarded. Given two weekends to do it first day started at 6am completed it at 6.30pm two handed. The boss was p***d off paying us two weekends for a days work!!

Ragscaff

Assuming you didn't stop for a break that works out at a lift every 41 minutes.

Not a bad average considering the top lift would have been around 125ft high (assuming 2.1m lifts)

Hmmmmmm......
 
well hope your new job has gone down well for you mate..Keep in contact in the future bud

---------- Post added at 04:36 PM ---------- Previous post was at 04:30 PM ----------

yeah i was happy enough with the price,it was just working 3 days with Steve thats the KILLER....lol...
 
Ray i dont mind constructive critism ...yeh the job has gone ok ...
 