philliosmaximus
Moderator
" Allegedly "
Thats an old row Flinty , at the end of the day the customer is going to pay for the drawings in the end anyway , so why not get them for the scaffolders to tender, instead of us second guessing everything then finding we have either over or under priced the job.
Clearly someone who doesn't understand drawings then. They'll moan like f*ck if you deviate from it though! I've been given sh!t drawings before.... 2.2m base life then a 2.7m 2nd lift.... yeah nice real drawing there....
try this 1 evey lift from base lift 2m about 7 lifts top lift 500mm back breaking
I think it also covers the situation where the firms go to the same designer and he ends up doing multiple copies of the same drawing, may as well just do the 1 and give a copy to the companies competing!
Not Guilty Your Honour , and in mitigation circumstances .............
Still no fekin drawing, might have to lash it up the morra.
Flinty, are you suggesting that not all the designers are whiter than white and some of their work may not be the crystal clear parchment of pure wisdom they would have us believe.
:laugh::laugh::laugh::laugh:
Thats brilliant! Why've they topped that tube out it doesn't go anywhere or do anything!!?!?
good spot
Get a long life battery for that fag aom cos it sounds like it could be another long un