Thephantomscaffolder
Member
- Joined
- Sep 11, 2012
- Messages
- 22
- Reaction score
- 0
That's not bad macca1394 where you working on price what sort of pay is it??
Hi all I am having some trouble with some of my questions for my NVQ, so was hoping some one could help
Q1. On a cantilever scaffold which point of the scaffold is known as fulcrum point?
point were the internal scaffold meets the external scaffold
Q2. Explain what the chords are in relation to prefabricated beams used for scaffolding?
the longest lenghts of a beam top and bottom hoziontaly there cords
Q3. When using prefabricated beams, which chord should be plan braced compression or tension?
compression (top when bridging bottom when sailing out )
Q4. How often are tie tubes required in the bottom chords of a pair of prefabricated scaffoldings beams?
every 2.2 m i think
Q5. Can ladder beams be fixed together and used as columns?
yes
Q6. How can you improve the performance of prefabricated beams?
install them correctly and fully braced up etc
Q7. Is a single guardrail adequate protection for a scaffolder to work within, in relation to for protection?
yes
Q8 what is the NASC code of practice covering fall protection for scaffolders working safely while erecting and dismantling scaffolding?
sg 4 : 10 sg = safety guild lines
Q9. State what equipment is associated with fall arrest?
harness
Q10. State the requirements that Anchorage points must fulfil?
bwetween to load bearing fittings eg 2 doubble on a hand rail/ ledger
Q11. How would you clean your harness?
warm water no soap or detergent
Q12. States where procedures for rescuing a person from the floor while wearing a harness should be kept?
dont unserstand this 1 whos wearing the harness you or them am asuming site office dont quote me
Thanks in Advanced