For fu ck sake they they should of easy done what you asked.there was some one on hear said when he starts a new gang he tests them out with a 3 sider up and a 3 sider down
Might get shot down in flames here but were the lads working to SG4? This has been a big difference in job duration.
Clipping on every 2 seconds and advanced guardrail vs walking on 2 boards and banging the job up!!
If it was boarded but not hand railed when he turned up I'd guess they weren't working to sg4
I wouldnt pay a part 2 £120 a day. I'd be looking at giving them a £100 tops.
Sounds to me like they're taking the ****, 2 sides 3 lifts and 1 of base isn't a great deal unless of course the runs are 100ft, but I expect and do 4 sider roofers say building dimensions 30ft x 40ft x 3 lifts completed by 3pm 2 handed one of which is usually a labourer or improver pt1, not exactly going for it but a steady progressive pace.
What time you start ?
How much you on a day
You must be a firms dream scaff
Not really mate, just your average joe pt2 street scaff, just motivated to get the job done and home, I will load up the day before or early in the morning, onsite and loading/setting out by 8am, based on 16ft high working platform, top lift not braced as its below my knee, forgo the advanced guard rail of step ups and single sissy rails, I earn a suppose the equivalent of £150 per day, Of course if pissing around with full ppe and single rails then you put a few hours on that, hate being encumbered by double lanyards and spanner lanyards, site inductions etc, this wouldn't be a main contractors site mind, this was how I was taught so its 2nd nature these days. Just have my own way of working where both are busy as oppose to one doing the fixing whilst the other just watches on picking their arse
Not really mate, just your average joe pt2 street scaff, just motivated to get the job done and home, I will load up the day before or early in the morning, onsite and loading/setting out by 8am, based on 16ft high working platform, top lift not braced as its below my knee, forgo the advanced guard rail of step ups and single sissy rails, I earn a suppose the equivalent of £150 per day, Of course if pissing around with full ppe and single rails then you put a few hours on that, hate being encumbered by double lanyards and spanner lanyards, site inductions etc, this wouldn't be a main contractors site mind, this was how I was taught so its 2nd nature these days. Just have my own way of working where both are busy as oppose to one doing the fixing whilst the other just watches on picking their arse