marra watson
Moderator
have been working on a job recently and the saftey officers a 2 day advanced inspection ticket holder i presume when the jobs finished he gets up checks every fitting every tube of level and plumb i mean litrally everything is checked have to leave 4 boards down the full lenght of the scaffold so he can jump up and check every bolt althow he for some reason dont need a doubble hand rail any reason why not and with 1 board missing shoul he be on the lift not only that but when its finished with we then have to go back up and turn all the boards on there side and tie to 1 side of the scaffold does this make sence to any of you?