Truss outs

stonedrose1

Well-known member
Joined
Dec 29, 2011
Messages
2,130
Reaction score
0
As the title says, here's a couple of truss outs we've done recently. Couldn't be @rsed with the 450mm alloy beam run through under the puncheons for the second one as it was a pain in the @rse reaching down to fix them. We just shot the ledger through and picked it up with spurs from the next lift.
 

Attachments

  • 052.jpg
    052.jpg
    95.3 KB · Views: 167
  • 051.jpg
    051.jpg
    92.1 KB · Views: 163
nice work stoned. Wouldnt an independant have been easier:wondering:
 
The client needed it built that way. They need clearance on the ground for plant movement and ground works. The beams are right through the building with the same at the rear. It's also fully boarded inside as the first floor level is completely removed.
 
Last edited:
I'm not sure about the distance passed the raker on the second picture.
 
Here's some photos from inside the building as requested. The last photo is from the ground floor after the first floor has been taken away.
 

Attachments

  • 001.jpg
    001.jpg
    93.1 KB · Views: 64
  • 002.jpg
    002.jpg
    94.1 KB · Views: 58
  • 004.jpg
    004.jpg
    91.7 KB · Views: 62
  • 003.jpg
    003.jpg
    96.3 KB · Views: 61
Top Bottom