It there a guidance note for sheeting of scaffold in exposed areas ?
I have just erected a large scaffold 40m long punched up of steel at the 7 metre point above the walkway it's tied back to steel beams every standard all the way up to the top lift 6 lifts at 2 metre x 1.8 metre and cantilevered at the top 4 boards for access. they have now asked to sheet the hole thing in my question is is there anything in regards to the ties used as out here they just use 6mm rope. Have told them must use bungees as they can snap if required due to high wings etc.
This has nothing to do with boxing , scuba diving :toung:
I have just erected a large scaffold 40m long punched up of steel at the 7 metre point above the walkway it's tied back to steel beams every standard all the way up to the top lift 6 lifts at 2 metre x 1.8 metre and cantilevered at the top 4 boards for access. they have now asked to sheet the hole thing in my question is is there anything in regards to the ties used as out here they just use 6mm rope. Have told them must use bungees as they can snap if required due to high wings etc.
This has nothing to do with boxing , scuba diving :toung: