Havespannerwilltravel
Moderator
- Joined
- Aug 5, 2010
- Messages
- 13,378
- Reaction score
- 0
Anyone got a rough estimate for scaffold on a cottage in Dolgellau, Snowdonia?
Front and back 25 foot, sides 30 foot, 2 boarded lifts all round with 10 foot table lifts on gables.
Scaff required for approx 3 months.
Front and back 25 foot, sides 30 foot, 2 boarded lifts all round with 10 foot table lifts on gables.
Scaff required for approx 3 months.