paddy carr
Moderator
How many times guys, as chargehand or supervisor, youve done this.
The gear is flying out the yard quicker than sh1t off a stick, i get Tubes and Boards transfered to my site, however there is no fittings anywhere. I put a order in for 1,000 singles, 1,000 doubles 100 sleeves, 200 swivels. they have to be bought.
3 weeks later the Contracts Manager says the fittings are on ther way. what are we doing now, stripping 16 blocks of scaff.
I now have a compound full of brand new bagged fittings and bins of old fittings coming in by the minute.
They will be going out soon, however, makes you feel like a Plum sometimes.
The gear is flying out the yard quicker than sh1t off a stick, i get Tubes and Boards transfered to my site, however there is no fittings anywhere. I put a order in for 1,000 singles, 1,000 doubles 100 sleeves, 200 swivels. they have to be bought.
3 weeks later the Contracts Manager says the fittings are on ther way. what are we doing now, stripping 16 blocks of scaff.
I now have a compound full of brand new bagged fittings and bins of old fittings coming in by the minute.
They will be going out soon, however, makes you feel like a Plum sometimes.