S
steveo south east
Guest
At first i was asked to build a matt 6metres by 4metres TF so i said yes no problem I have now been ask to erect a matt 12metres by 4Metres TF no beams netted and debre netted to cover a hole 4 metres deep and ten metres at the widest point (its to stop debre coming up from the hole and disrupting the planes in transit)
I can see several problems
moving it into place,
I dont know how it will react as they would have to strop it at each corner (otherwise they will be in the hole)
Its for temporary work so it will be lifted a lot intergrity of scaffold matt
They will be using a 35 ton excavator with chains
Has anyone built a Matt lay down matt out of TF to these sort of dimesions without using beams
PS i am not on for a scaffold company at the moment (they must be saving a fortune) so trying to talk to them about TG20 and Design is difficult for them to swallow especially from a scaffolder, but i am in a place where the client has zero tolrorence on ignorance.
I can see several problems
moving it into place,
I dont know how it will react as they would have to strop it at each corner (otherwise they will be in the hole)
Its for temporary work so it will be lifted a lot intergrity of scaffold matt
They will be using a 35 ton excavator with chains
Has anyone built a Matt lay down matt out of TF to these sort of dimesions without using beams
PS i am not on for a scaffold company at the moment (they must be saving a fortune) so trying to talk to them about TG20 and Design is difficult for them to swallow especially from a scaffolder, but i am in a place where the client has zero tolrorence on ignorance.