A photo of the building fixed to the outside of the scaffold.

I've been involved designing and fixing a few of these recently but am getting conflicting info on how best to go about it.
Some say cable ties and others (me included) prefer 8mm or 10mm bungie cord.

One screen was manufactured as a single item at 10m by 8m. It flapped a lot.

Wrapping the screen around a flush (use of finials) tubular frame set 300 off the scaffold and pulled back to the scaffold using bungie cord seems to work best so far.

Any other recomendations?

Max width of screens?

Does anyone know a good supplier who has material to the latest (2014) LPCB fire testing guidlines? Most I've seen is to the old 18 year old standards only.
It is for a large prestigious job.
 
Morning Dennis,
I did similar some years ago at Birmingham Town Hall the sheeter used as you say bungies.
To create the sheeting frame I used the old red Haki sticks which were the old roof system sheeting frames the timber battens were less damaging to the final product and gave a nice flush support frame.
I think you may see pictures in my albums on here of the end result.
 