Just wondering what you like doing.
Got a few to do, with drilled anchors into the slab using Excalibur bolts with B&P obviously, but at the far end of the beams, inside the lift shaft,
I get the lads to drill in another set in the lift shaft wall, just in case the 2 outside preventing uplift fail, now by doing this, it's not really a cantilevered scaffold but can't help doing it, as it's a long way down if they do fail.
Got a few to do, with drilled anchors into the slab using Excalibur bolts with B&P obviously, but at the far end of the beams, inside the lift shaft,
I get the lads to drill in another set in the lift shaft wall, just in case the 2 outside preventing uplift fail, now by doing this, it's not really a cantilevered scaffold but can't help doing it, as it's a long way down if they do fail.