marra watson
Moderator
how long would you expect to take on this man hours gang of three
gable end 2 boards wide 3 lift(between two buildings tite) top lift opended up to 3 boards top lif boarded 16 bays @ 10ft
back 14 bays @ 8ft returned with beams and 1 boarded lift on beams 20f
3 lifts top lift boarded
front 14 bays at 8ft with 3 board canterleaver brack top lift to a 8ft bay top lift boarded again
other gable 6 towers 8 ft 2 lift inside topped out handrails round flat roof all easy acces oher than 1 gable how long would you give 3 to do it ?
gable end 2 boards wide 3 lift(between two buildings tite) top lift opended up to 3 boards top lif boarded 16 bays @ 10ft
back 14 bays @ 8ft returned with beams and 1 boarded lift on beams 20f
3 lifts top lift boarded
front 14 bays at 8ft with 3 board canterleaver brack top lift to a 8ft bay top lift boarded again
other gable 6 towers 8 ft 2 lift inside topped out handrails round flat roof all easy acces oher than 1 gable how long would you give 3 to do it ?