Is there enough trannys in that boss?

I wish you wouldn't call them trannies... :D, especially in that boss!
 
Is that a barcode or transoms. Holy Mary

Sent from my GT-I9300 using Tapatalk 2
 
A few years ago we did a loading bay with the lifts at 2.7m floor levels.

When we got the design done it had 3 sets of beams on each lift and the trannies where 4 inches apart.
 
3 less than i put in my loading bays 8 standards use to be 6 standards and 8 trannys :laugh:
 
Looks very similar to what I have to put up, got a telling off yesterday for not putting 20 transoms in one of the loading bays :(
 
Old firm I was on had a similar design that barrats sent out to hold six tonne but stil only alowed 2 packs of bricks on it so wat was the point
 
the loading bays we have to do are the same but with 25 trannys 25 punch up for next lift 4 standards but this is how the trannys are laid green red and blue all trannys green 1's ither end irght on the board ender and the next red 3 are were the band is about 2/3 inch appart then the same next to all the standards and in between 3 trannys splitting the diffrence plan braced ledger braces sway fornt back takes about an hour to lift them lol


loading bays.jpg
 
Top Bottom