How quick is your crew

khrisscaf

Member
Joined
Feb 18, 2013
Messages
18
Reaction score
0
How long would it take y to erect tube and fitting 3 .2m bays 7 lifts high top deck boarded and access through lift boarded at each access point . 2 scaffolders 2 labourer gear 5 m away from area
 
3.2m bays!!!!!!!!!!!!
Half the kit half the time!!
 
7 lifts high and 6m long can be really quick or take forever it all depends who's watching.
 
How long would it take y to erect tube and fitting 3 .2m bays 7 lifts high top deck boarded and access through lift boarded at each access point . 2 scaffolders 2 labourer gear 5 m away from area

street firm 3 to 4 hours if keen!!! nuclear or industrial job 1 week :laugh:
 
street firm 3 to 4 hours if keen!!! nuclear or industrial job 1 week :laugh:



Street firm gang of 3 as Kev says around 3hrs.
A gang from swansea in orange boiler suits around a week.
 
Street firm gang of 3 as Kev says around 3hrs.
A gang from swansea in orange boiler suits around a week.

or get philliosmaxius in 20 minutes hes brutal feeds hes men on raw meat:laugh:
 
or get philliosmaxius in 20 minutes hes brutal feeds hes men on raw meat:laugh:

Most of the Lithuanians that have moved to London in the last few years live on a red meat only diet.
Phil is missing out there.:laugh:
 
If it was Layher you can halve the time for a street firm but the orange boiler suit crew would need to do some training 1st, probably pushing the job to the 2nd week if they worked 12hr shifts.
 
Blue book job 3 man squad 2 x 10 hour shifts the job will be done safely and correctly 3 x 30 min breaks shall be taken each day as well as smoke breaks in between these.
 