Can take longer to handrail the chimney stack with toe boards, that putting the ring round and boarding it out.
When I was on price work in London, we used to get paid the tower and the throw in was stood up and added on.
Example 30ft tower + 20ft throw in on ridge = 50ft x pound per rising ft = Labour erect price.