How much material would you think a engineer woul do a drawing to support a machines

scaffofsmeg

Member
Joined
Dec 11, 2012
Messages
7
Reaction score
0
How much would go into a job supporting well over 100 tone supported with acrows for demolition floor height is 4 m ???
 
How much would go into a job supporting well over 100 tone supported with acrows for demolition floor height is 4 m ???

Sorry lack of information.

Well over 100 could be 500 need to be exact.
What does the 100 look like?
If this is for demo what is the intended method of appling the load to the platform?

Is there an impact load to consider,

Etc etc etc.

Involve your Engineer now rather than later
regards
Alan
 