Hello chaps
We run a small, one truck (7.5t) local scaffold company that mainly does local work in London.
The accepted mantra is that the labourer drives the truck from about 7am, picks-up everyone for a breakfast and then hit the site at 8am ish?
Alternatively they may drive to the yard and do whatever is needed there and then leave there about 8:30
Knocking off time is about 2pm, 2:30pm at the latest
How does this compare with you, and what are your ways of working?
Do you send you men to start at the site at 8am and have them work through to 3pm? If so who drives the kit there and back?
Thanks
We run a small, one truck (7.5t) local scaffold company that mainly does local work in London.
The accepted mantra is that the labourer drives the truck from about 7am, picks-up everyone for a breakfast and then hit the site at 8am ish?
Alternatively they may drive to the yard and do whatever is needed there and then leave there about 8:30
Knocking off time is about 2pm, 2:30pm at the latest
How does this compare with you, and what are your ways of working?
Do you send you men to start at the site at 8am and have them work through to 3pm? If so who drives the kit there and back?
Thanks