hi
i really should already know the answer to this, but doubting myself as usual
standard 3 x 1.50m high lift tube and fitting scaffold to new housing project, if we add debris netting to it, does it have to be engineer designed ?
thanks in anticipation
i really should already know the answer to this, but doubting myself as usual
standard 3 x 1.50m high lift tube and fitting scaffold to new housing project, if we add debris netting to it, does it have to be engineer designed ?
thanks in anticipation